New Wave Pool Constructed In Japan
The civil works were completed in 389 days.
Did this wave-pool pop up out of nowhere? Basically. It took the PerfectSwell crew roughly a year to build a wave-pool in Shizunami, Japan.
The pool was designed with new levels of hydrodynamic control in mind. “Temporal Distortion will lead to an entirely new selection of waves for both high-performance and learning applications,” said William McFarland, AWM Surf Programmer. “This level of control will add shifting elements to the surf creating a more dynamic wave overall.”
The pool will announce an open date once the travel ban from the US to Japan is lifted.
Comments
Comments are a Stab Premium feature. Gotta join to talk shop.
Already a member? Sign In
Want to join? Sign Up